The accompanying table records the 10 largest construction project starts in Canada in October 2022. Also included is the latest trend graph on starts. This looks at 12-month moving totals of the civil and non-residential building categories in Canada.
There are several reasons for highlighting upcoming large projects. Such jobs have often received a fair amount of media coverage. Therefore, people in the industry are on the lookout for when job-site work actually gets underway. And, as showcase projects, they highlight geographically where major construction projects are proceeding.
Also, total construction activity is comprised of many small and medium-sized projects and a limited number of large developments. But the largest projects, simply by their nature, can dramatically affect total dollar and square footage volumes. In other words, the timing and size of these projects have an exaggerated influence on market forecasts.
REGION (East to West) |
TYPE OF CONSTRUCTION |
DESCRIPTION |
Sq. Ft.
000s |
Dollars
000,000s |
Newfoundland & Labrador | Ìý | Ìý | Ìý | Ìý |
Millertown | Civil/Engineering | Valentine Gold Project | *Ìý | $305 |
Ìý | Ìý | (1 structure) | Ìý | Ìý |
Ìý | Ìý | Marathon Gold Corporation | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
²Ï³Üé²ú±ð³¦ | Ìý | Ìý | Ìý | Ìý |
Laval | Civil/Engineering | D/B Laval Aquatic Complex | 150 | $125 |
Ìý | Ìý | (3 structures; 3 storeys; 500 units) ave Terry-Fox | Ìý | Ìý |
Ìý | Ìý | Vill de Laval, Commission Scolaire Sir-Wilfrid-Laurier, Mouvement Aquatique Laval | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Ontario | Ìý | Ìý | Ìý | Ìý |
Etobicoke | Commercial | Eglinton Crosstown West Extension (ECWE) – Line 5 | * | $604 |
Ìý | Ìý | (2 structures) Multiple Locations | Ìý | Ìý |
Ìý | Ìý | Metrolinx, Infrastructure Ontario | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Grimsby | Institutional | RFP D/B – Design Build Finance – West Lincoln Memorial Hospital Redevelopment Project | *Ìý | $200 |
Ìý | Ìý | (1 structure; 5 storeys) 169 Main St E | Ìý | Ìý |
Ìý | Ìý | Hamilton Health Sciences, Infrastructure Ontario | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Scarborough | Residential | Birchley Park Condominium, Retail Building Mixed Use Development | 650Ìý | $120 |
Ìý | Ìý | (4 structures; 6 storeys; 1052 units) 411 Victoria Park Ave | Ìý | Ìý |
Ìý | Ìý | Habitat For Humanity/Diamond Kilmer Developments | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Brampton | Institutional | Jeevan Niwas Retirement Village / Brampton | 127Ìý | $80 |
Ìý | Ìý | (4 structures; 12 storeys; 156 units) 9664 Goreway Dr | Ìý | Ìý |
Ìý | Ìý | Jeevan Niwas Retirement Village/Chacon Developments | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Manitoba | Ìý | Ìý | Ìý | Ìý |
Neepawa | Institutional | Neepawa Health Centre | 180Ìý | $127 |
Ìý | Ìý | (2 structures; 3 storeys; 63 units) 500 Hospital St | Ìý | Ìý |
Ìý | Ìý | Winnipeg Regional Health Authority, Shared Health Corporated Office | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Alberta | Ìý | Ìý | Ìý | Ìý |
Edmonton | Industrial | Air Products New Hydrogen Complex | * | $1,300 |
Ìý | Ìý | (1 structure) 13130 25 St NE | Ìý | Ìý |
Ìý | Ìý | Air Products Canada Ltd | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Cold Lake | Industrial | Imperial Oil – Cold Lake Enhancement Project – Grand Rapids Reservoir | *Ìý | $450 |
Ìý | Ìý | (1 structure) | Ìý | Ìý |
Ìý | Ìý | Imperial Oil Ltd | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
Aldersyde | Civil/Engineering | Saddlebrook Solar + Storage Project | *Ìý | $146 |
Ìý | Ìý | (2 structures) AB-2A & Township Rd 200 | Ìý | Ìý |
Ìý | Ìý | TC Energy | Ìý | Ìý |
Ìý | Ìý | Ìý | Ìý | Ìý |
TOTALS: | Ìý | Ìý | 1,107 | $3,457 |
Moving totals of the latest 12 months*
(°µÍø½ûÇøConnect Insight Forecast Figures)
Interactive Visual
View this video to see how to use the filters in the Interactive Visual.
Please click on the following links to download the PDF versions of this month’s Top 10 and Trend Lines:
You have a lot of good articles to share. Zenith °µÍø½ûÇøion is a multiple-grown Building Company in Canada that provides Drywall, steel structures, listening shelters, and plastering.